Capex WireMore than $1.8 trillion in U.S. capital projects on the map, with new ones every day. Just $9.90/month, cancel anytime.Subscribe ›
Saturday, Nov. 28, 2026 · U.S. editionNov. 28, 2026How we reportLog inSubscribe to Capex Wire

U.S. capital projects before the bid list closes.

Metals & Mining · Under construction

Lithium Americas Corp.

Lithium Americas Corp. is building a critical minerals plant in Thacker Pass, NV, with an estimated $3.4 billion investment.

Thacker Pass, Humboldt County, Nevada

Investment

$3.8 billion

revised Phase 1 capital cost estimate including contingency, as announced by Lithium Americas Nov. 11, 2026 (SEC Form 8-K, Exhibit 99.1); up from a prior 2.93 billion dollar estimate; CIM database listed an earlier estimate

Project fileNV
Owner
Lithium Americas Corp.
Investment
$3.8 billion (revised Phase 1 capital cost estimate including contingency, as announced by Lithium Americas Nov. 11, 2026 (SEC Form 8-K, Exhibit 99.1); up from a prior 2.93 billion dollar estimate; CIM database listed an earlier estimate)
Location
Thacker Pass, Humboldt County, Nevada
Sector
Metals & Mining
Type
Critical minerals plant (lithium carbonate), new construction
Stage
Under construction
Construction start
Not disclosed
Completion
Not disclosed
Contractor / EPC
Bechtel (EPCM contractor, referenced by the company)
Source
Lithium Americas Corp. press release (SEC Form 8-K, Exhibit 99.1), Nov. 11, 2026
Added to the map
Nov. 20, 2026

What this project buys

  • Site work and foundations
  • Process piping
  • Electrical and instrumentation
  • Structural steel erection
  • Tanks and vessels
  • Insulation and coatings

Typical scopes for a project of this type. This is an editorial estimate, not a list of awarded or advertised packages.

More projects in Nevada

  • Nov. 20, 2026
    Owner hidden

    Battery storage project, new construction

    Likely to buy: Site work and foundations, Battery container installation, Electrical and substation

    Clark County, NVPower & Energy$152 millionUnder construction
  • Nov. 20, 2026
    Owner hidden

    Battery plant (eam), expansion

    Likely to buy: Site work and foundations, Structural steel erection, Electrical and substation

    Sparks, NVManufacturing$2.1 billionUnder construction
  • Nov. 20, 2026
    Owner hidden

    Geothermal plant, new construction

    Likely to buy: Civil and concrete works, Mechanical and turbine installation, Electrical and substation

    Esmeralda County, NVPower & Energy$156.2 millionAnnounced
  • Nov. 20, 2026
    Owner hidden

    Sustainable aviation fuel plant (HEFA), expansion

    Likely to buy: Site work and foundations, Process piping, Electrical and instrumentation

    Clark County, NVOil, Gas & LNG$1.1 billionAnnounced
  • Nov. 20, 2026
    Owner hidden

    Solar power plant, new construction

    Likely to buy: Site work and grading, Pile driving and racking, Electrical and collection system

    Clark County, NVPower & Energy$245.4 millionUnder construction