- Owner
- Lithium Americas Corp.
- Investment
- $3.8 billion (revised Phase 1 capital cost estimate including contingency, as announced by Lithium Americas Nov. 11, 2026 (SEC Form 8-K, Exhibit 99.1); up from a prior 2.93 billion dollar estimate; CIM database listed an earlier estimate)
- Location
- Thacker Pass, Humboldt County, Nevada
- Sector
- Metals & Mining
- Type
- Critical minerals plant (lithium carbonate), new construction
- Stage
- Under construction
- Construction start
- Not disclosed
- Completion
- Not disclosed
- Contractor / EPC
- Bechtel (EPCM contractor, referenced by the company)
- Source
- Lithium Americas Corp. press release (SEC Form 8-K, Exhibit 99.1), Nov. 11, 2026
- Added to the map
- Nov. 20, 2026
What this project buys
- Site work and foundations
- Process piping
- Electrical and instrumentation
- Structural steel erection
- Tanks and vessels
- Insulation and coatings
Typical scopes for a project of this type. This is an editorial estimate, not a list of awarded or advertised packages.